Residential

Residential

Pages Walk

Southwark

Back to Projects

Client: O’Callaghan Properties and Meadow Partners

Project: New build of 86 high-quality residential apartments with basement car park.

Cost: £23M

RIBA Project Stages: 0-6

86 high quality residential apartments over four blocks to six stories, with basement car parking and plant space, hard and soft landscaping and shared communal areas.

The opportunity

The development was purchased with an existing planning permission. Total Project Integration were appointed by the joint developer to oversee the design, procurement and construction.

The challenge

The main challenge was building on a brownfield site with a single access point surrounded by residential apartments and a school. Measures were put in place to ensure minimal disruption to the surrounding neighbours. Total Project Integration also proposed and implemented a re-positioning and redesign of the basement and foundations, which were originally positioned under one of the blocks adjacent to two party walls.

The outcome

The basement was re-positioned under the central courtyard to provide support to the above ground structures on its perimeter, more efficient services distribution and access from the car park to all the blocks and lifts. This too enabled an open dig excavation, removal of the piled foundations designed throughout, avoided temporary works and party wall awards resulting in a major financial gain for the client.

Other Residential projects

Glenthorne Road

Hammersmith

Project: Demolition of existing office block and new build of 52 high quality residential apartments.

Client: O’Callaghan Properties and Meadow Partners

Cost: £12M

Baylis Road

LONDON

Project: Seven storey new build of 10,200ft2 of high-quality apartments, including duplex apartments, 4,700 ft2 of CAT A office space and 3,500 ft2 of retail.

Client: O’Callaghan Properties

Cost: £4.2M

Avion Court

Crawley

Project: Part demolition of an existing office block to create 137 residential units in Crawley town centre.

Client: Interland Group

Cost: £9M