Cedar Hall

Tooting, London

Back to Projects

Client: Interland Group

Project: London-based, student accommodation development over 2 phases.

Cost: £5.7M

A 2-phased development which included a two-storey vertical extension to an existing student accommodation block (Phase 1) and an adjacent new build block (Phase 3).

The opportunity

Phase 1 involved the extension to the existing building to provide an additional 34 units. Works included underpinning within the existing basement to support the additional loads imposed. Phase 3 saw the creation of new build block comprising of 30 new student accommodation units, associated common areas and external works.

The challenge

Both phases were carried out in a ‘live environment’, whilst the building was still occupied by students, so it was paramount that careful liaison took place to ensure minimal disruption to the residents.

The outcome

At both stages, the work was completed in time for the intake of the coming year of students.

Other Residential projects

The Green

Bradford

Project: BREAM Outstanding Student Accommodation.

Client: MI7 Developments and Welbeck Land

Cost: £32M

Atrium Point

Greenford, LB Ealing

Project: Office to residential conversion of former multi-storey office HQ (Kellogg Tower).

Client: Interland Group

Cost: £27M

Avion Court

Crawley

Project: Office to residential conversion in West Sussex.

Client: Interland Group

Cost: £9M