Client: Paradigm Housing Group

Project: The desigtn and build of 120 apartments in three blocks, the tallest of which is 10 storeys.

Cost: £19M

RIBA Project Stages: 1 - 7

The recommencement of a residential scheme comprising of 120 apartments, landscaped podiums and a commercial unit, following the main contractor insolvency.

The opportunity

Total Project Integration was presented with the chance to take over what had once been a live site, with limited knowledge on the scope of work which had previously been carried out. The client was aware of several defects on the already constructed RC frame but did not know the full extent.

The challenge

The site is located adjacent to Hayes and Harlington Cross Rail Station. A Structural Engineer was appointed to carry out a full structural assessment of the RC frame. The results from the assessment highlighted several design and construction errors which had to be resolved. A Basic Asset Protection Agreement (BAPA) was agreed and put in place before the work re-commenced.

The outcome

To overcome the frame solution, several steel columns, with the use of Carbon Fibre Reinforced Polymer (CFRP), were installed to reinforce the existing frame. A fixed price contract was agreed with the main contractor to undertake the remedial works to the frame and to complete the fit-out.

Other Residential projects

Baylis Road

LONDON

Project: Seven storey new build of 10,200ft2 of high-quality apartments, including duplex apartments, 4,700 ft2 of CAT A office space and 3,500 ft2 of retail.

Client: O’Callaghan Properties

Cost: £4.2M

Avion Court

Crawley

Project: Part demolition of an existing office block to create 137 residential units in Crawley town centre.

Client: Interland Group

Cost: £9M

Atrium Point (formerly Kellogg Tower)

Greenford, LB Ealing

Project: Conversion of a former multi-storey office HQ to create 270 new PRS units and a 100-space rear car park.

Client: Interland Group